Proses Produksi pada Mesin Asphalt Mixing Plant (AMP) Nikko CBD 100 Japan untuk Pembuatan Aspal Hotmix di PT. XYZ

Authors

  • Rivaldo Situmorang Universitas Singaperbangsa Karawang
  • Boni Sena Universitas Sigaperbangsa Karawang

DOI:

https://doi.org/10.33504/manutech.v18i01.838

Keywords:

production process, asphalt mixing plant, hotmix asphalt, production efficiency, machine maintenance

Abstract

This study aims to analyze the production process of hotmix asphalt using the Asphalt Mixing Plant (AMP) Nikko CBD 100 at PT. XYZ. The production process involves several stages, including material preparation, aggregate drying, mixing, and product quality testing. The use of the AMP Nikko CBD 100 enables the production of asphalt that meets technical standards, but it requires precise temperature control and proper composition of raw materials. This report utilizes field observation and interviews with relevant personnel at the company to identify factors affecting production efficiency. The results show that mixing temperature and the composition of raw materials, such as aggregates and fillers, play a crucial role in determining the quality of hotmix asphalt. Additionally, routine maintenance of the AMP machine is key to ensuring smooth production. This study is expected to contribute to the manufacturing industry by enhancing the efficiency and quality of hotmix asphalt production through optimal management of the production process and machine maintenance.

Downloads

Download data is not yet available.

References

A. A. A. M. C. Wardani, I. N. A. Thanaya, and N. Y. Astana, “Production Stage and Risk Identification on Asphalt Mixing Plant in Bali,” vol. 4, no. 3, 2019.

M. T. Ahmed, M. R. Rashel, M. Islam, A. K. M. K. Islam, and M. Tlemcani, “Classification and Parametric Analysis of Solar Hybrid PVT System: A Review,” Energies, vol. 17, no. 3, 2024, doi: 10.3390/en17030588.

H. Pandowo et al., “Journal of Economics and Public Health Volume 2 No 2 , June 2023,” vol. 2, no. 2, pp. 43–50, 2023.

I. F. Analysis, A. M. Plant, C. Study, P. T. P. Karya, P. Basecamp, and Y. S. Region, “( Studi Kasus?: PT Perwita Karya di Base Camp Piyungan , Bantul ),” vol. 12, no. 2, pp. 199–208, 2009.

A. Ahmad and Y. Herdianzah, “Penerapan Total Productive Maintenance (TPM) untuk Peningkatan Efektivitas pada Pabrik Skincare di Kota Batam,” vol. 9, no. 1, pp. 1–11, 2023.

M. Line and P. T. Xyz, “Efisiensi Lini Produksi Asphalt Mixing Plan Dengan,” vol. 3, no. 2, pp. 115–126, 2022.

S. Iskandar and R. R. Padmakusumah, “Jurnal Impresi Indonesia ( JII ) Analisis Progress Implementasi TPM ( Total Productive Maintenance ) dan Proyeksi Manfaatnya bagi Peningkatan Produktivitas ( Studi Kasus pada Perusahaan X ),” pp. 2532–2547, 2023.

I. M. Sayuti, “Analisis Produktivitas Perawatan Mesin dengan Metode TPM ( Total Productive Maintenance ) Pada Mesin Mixing Section,” vol. 4, no. 2, pp. 10–13, 2016.

D. A. Putra and Y. P. Devia, “Evaluation of Production Efficiency in Asphalt Mixing Plant Using Lean Concept Based on TIMWOOD,” vol. 7, no. 5, pp. 1049–1060, 2025.

P. Studi, T. Industri, F. Teknik, and U. M. Riau, “Analisis Efektivitas Kinerja Mesin Asphalt Mixing Plant dengan Metode Overall Effectiveness Equipment,” vol. 10, no. 2, pp. 779–787, 2023.

Downloads

Published

2026-06-30

How to Cite

Situmorang, R., & Sena, B. (2026). Proses Produksi pada Mesin Asphalt Mixing Plant (AMP) Nikko CBD 100 Japan untuk Pembuatan Aspal Hotmix di PT. XYZ. Manutech : Jurnal Teknologi Manufaktur, 18(01), 200–205. https://doi.org/10.33504/manutech.v18i01.838