Implementasi Total Productive Maintenance untuk Meningkatkan Keandalan Excentric Slotter Machine pada Industri Kemasan Karton

Authors

  • Muhamad Jiddan Fathul Qorib Universitas Sigaperbangsa Karawang
  • Marno Marno Universitas Sigaperbangsa Karawang
  • Ujiburrahman Ujiburrahman Universitas Sigaperbangsa Karawang
  • Deni Hidayat Universitas Sigaperbangsa Karawang

DOI:

https://doi.org/10.33504/manutech.v18i01.835

Keywords:

total productive maintenance, machine maintenance, excentric slotter machine, manufacturing industry

Abstract

This study aims to analyze the implementation of Total Productive Maintenance (TPM) on an Excentric Slotter Machine in the carton packaging manufacturing industry. TPM is applied through preventive, predictive, and corrective maintenance approaches to improve machine reliability and reduce production downtime. The research uses a descriptive qualitative method with a case study approach, involving direct field observation, interviews with operators and maintenance personnel, and literature review related to industrial maintenance. The results indicate that TPM implementation is effective in identifying critical machine components, including the eccentric shaft, slotter blades, gear mechanism, lubrication system, and drive motor. Planned maintenance activities contribute to improving machine operational stability and supporting continuous production processes. This study is expected to provide practical references for manufacturing industries in implementing TPM-based maintenance strategies to enhance equipment reliability and production performance.

Downloads

Download data is not yet available.

References

[1] A. R. Widya and H. Widyatri, “Journal of Optimization System and Ergonomy Implementation Tinjauan Penerapan TPM ( Total Productive Maintenance ) dengan mengukur nilai OEE ( Overall Equipment Effectiveness ): Berbagai Sektor Industri,” vol. 3, no. 01, pp. 51–61, 2025.

[2] M. M. Saxena, “Total Productive Maintenance ( TPM ); As A Vital Function In Manufacturing Systems,” vol. 3, no. 1, pp. 19–27, 2022.

[3] A. B. Jannahti, C. Lasmana, and M. Fauzi, “Implementation of Total Productive Maintenance ( TPM ) Using Overall Equipment Effectiveness ( OEE ) Method on HPLC Instruments in Laboratory,” vol. 10, no. 1, pp. 223–230, 2024.

[4] N. Venkateswaran, “Arabian Journal of Business and Total Productive Maintenance ( TPM ) Practices Adopted at Manufacturing Unit?: An Analysis,” vol. 7, no. 4, 2017, doi: 10.4172/2223-5833.1000313.

[5] J. Teknik, M. Alat, and P. N. Balikpapan, “Analisis Sistem Perawatan Mesin Menggunakan Metode Reliability Centered Maintenance ( RCM ) Sebagai Dasar Kebijakan Perawatan yang Optimal di PLTD ‘ X ,’” vol. 1, no. 1, pp. 42–49.

[6] J. Ilmiah et al., “Penerapan Total Productive Maintenance (TPM) Pada Perawatan Mesin Cutter di PT. XYZ Ganep Muhaemin 1 , Asep Erik Nugraha 2,” vol. 8, no. June, pp. 205–219, 2022.

[7] J. Biswas, “Total Productive Maintenance?: An In-depth Review with a Focus on Overall Equipment Effectiveness Measurement,” vol. 13, no. 4, pp. 376–383, 2024.

[8] L. Setiawan, “Literature Review of the Implementation of Total Productive Maintenance ( TPM ) in various Industries in Indonesia,” vol. 2, no. 1, pp. 16–34, 2021.

[9] S. Kasus et al., “Analisis Penerapan Total Productive Maintenance ( Tpm ) Dengan Perhitungan Overall Equipment Efectiveness ( Oee ) Dan Six Big Losses Mesin Cavitec PT . Essentra Surabaya”.

[10] E. Puspitasari, V. Viyus, Nurchajat, and T. Machfuroh, “Analisis Perawatan Mesin Injection Moulding dngan Metode RC dan FMEA di PT ‘X,’” G-Tech J. Teknol. Terap., vol. 8, no. 1, pp. 134–145, 2023, doi: 10.33379/gtech.v8i1.3530.

Downloads

Published

2026-06-30

How to Cite

Qorib, M. J. F., Marno, M., Ujiburrahman, U., & Hidayat, D. (2026). Implementasi Total Productive Maintenance untuk Meningkatkan Keandalan Excentric Slotter Machine pada Industri Kemasan Karton. Manutech : Jurnal Teknologi Manufaktur, 18(01), 188–193. https://doi.org/10.33504/manutech.v18i01.835